The priority of the work must be considered together, 2. is the most important and urgent tasks that are both important and urgent, will need to be done before the first.The amount of work and time for both the existing simultaneously to the work that is not important and not urgent, it may be considered if there is no time to cancel is not to be done, don't forget "important things to do before." Where?The time should be flexible and allow plenty of time to save and what to do (thing to do), will be important to do, do not forget that will be required to do.
การแปล กรุณารอสักครู่..