When we were building and utility systems, and it is time that the machine arrived. I had made plans to set up a machine from the machine preparation, such as cranes, truck equipment and materials foklif team to install the machine, and I want to coordinate with foreign technicians to install the machines. When the installation is started and run test machines are able to produce work based on the performance of the machine and the quality standards.
การแปล กรุณารอสักครู่..
