As 16: 09-16: 29 20 / - P99 Chuang move T / D. Makes, fade not directly Stan T car casts are UU
be a made iron tank L / D into the bucket T / D 5 minutes about 5 T
. Bring back. As D-12885 garden tank furnace L / D to down L / F.
02: 47-02: 50 3 / - P99 S-55438 be a steel of U sea abuse interventions. Bring back to the furnace tank, all a
.S-55441 = 20 Tons.
is 07: 33-08: 22 49 / - P11 ST.2 S / G. The U วซม
is 07: 33-08: 22 49 / - P11 ST.3 S / G. The U วซม, flowing into the tank Ting about 5 tons a
14: 41-15: 07. 26 / - E08 Stop Cast ST.1 Crosstransfer Trip.
14: 41-15: 07 26 / - E08 Stop Cast ST.2 Crosstransfer Trip.
14: 45-15: 17 32 / - E08. Stop Cast ST.3 Crosstransfer Trip. Cast tank T / D all
.The tank L / D bring back. D-12885 furnace = 5 Tons.
14: 43-14: 46 3 / - P99 D-12884 waiting. The cast ขดข,. Be back. Like a
D-12886 stove Dang '= 23 CCB Tons.
. There UC02: 57-03: 02 4 / - I04 wait for crane steel tank 1 clear number 4 swing
a C03: 23-03: 35 12 / - I04 wait for crane steel tank 2 clear number 4 swing
a C03: 50-03:55 4 / - I04 wait for crane steel tank 3 clear number 4 swing
C04: 14-04: 21 7 / - I99 wait LF mouth through a tank
C04: 27-04: 29 3 / - I04 wait for crane steel tank 1 clear number 4 swing
. As UC04: 49-05: 14 26 / - I04 wait for crane steel tank 2 clear number 3 change tank after Luke pond times, leading 4 S
has well furnace number number 6 to เอานํ a steel furnace SOE to CCM1
a C05: 33-05:36 3 / - I04 wait for crane steel tank 3 clear number 4 swing
C05: 50-05: 53 3 / - P05
A07 SOE: 46-08: 30 44 / - 01
water. 95 - art 6 furnace bag normally keep burning furnace spray art เหล็กข. An Al, lead and U
change after Luke to carbon tank number 1.2.3 keep burning furnace steel edge from UU
.It's me every ng rouge, a mineral with every งข, two make clean around the stove normally
DMG
A08: 20-08: 49 29 / - I04
A09: 01-09: 33 32 / - 01
A09: 57-10: 05 6 / -
A13: 28-13: 30. 3 / -
A14: 28-14: 36 8 / -
B 15: 10-15: 21 11 / - I04
I04 I03 I05 Printed Date: 02 / 12 / 2014 09: 09: 59
Grand Total Downtime / Idle = 654 '. [10: / 0 '[0: 00'] B 15: 21-15: 52 30 / - I03
. It's B 16: 14-16: 18 4 / - I04 raise mineral clear chat
.UaB 16: 26-16: 52 26 / - I10 wait new scrap and be a. Steel furnace and furnace 12884 back Tang's
has a ant due to the CCM2 swing Tang Long temperature regions the U I
B 16: 53-17: 07 14 / - I03
B 17: 20-17: 22 3 / - P05
a? C23: 12-23: 29. 17 / - I99 Lin Su mineral is not closed them. Take ME you, set
that C01: 37-01:45 8 / - I04 crane number 4 swing behind the stove number 6 pour stove no? You, EE set
C01: 54-01: 57 3 / - I07 pouring furnace number 6 crane เอานํ a made steel LF to CCM
. There UC02: 04-02: 07 3 / - I04 wait for crane steel tank 1 clear number 4 swing
a UC02: 26-02: 31 4 / - I04 wait for crane steel tank 2 clear number 4 swing
< End Of Report >
. A08: 30-08: 42 10 / - I05
has A13:43-13: 56 14 / - I07 not tank L / F pouring furnace
B15: 02-15: 52 50 / - I03 1.2. Polishing of model
for crane lift ถังนํ a number 6 pouring furnace steel L / D through the U วที U
. B17: 34-17: 42 8 / - 99 spend 95 art furnace, a number 2.
- ทะลุน CCM.1 some water a made out of an iron furnace -
spend M.90 spray art furnace 5
B17: 51-17: 55. 4 / - P05
.Bags (viwathanateepa furnace spray and flow down, an active furnace. This model spray a made 2U
as C22: 46-22: 51 5 / - I04 clear steel tank 2
around) - carbon Tang 3A
C02: 39-02: 46 7 / -. I07 wait for pouring furnace tank - cleaning of an Al Green on the edge weight iron stove - U
C03: 43-03: 48 5 / - I07 clear steel tank as 2
C04: 31-04: 48 17 / - I07 pouring furnace
. As C04: 53-04:57 5 / - I04 clear scrap 4 tons
U รอนํ a steel tank T / D from CCM1 = 2 tons tank L / D from CCM2 = 5 tons back C04: 57-05: 09 11 / - I05.
การแปล กรุณารอสักครู่..