1. study and trial under roll TM-FT008 1.1 by have made since the load bobin. The set up is similar to a value in the P-tube machines. 1.2 do the wiring tube through the relay pool, then press start.1.3 when the alarm In the notification, the term anniversary set. Using scissors, cut a piece of work, and then stick the yellow tape to indicate that it is a coil end points.1.4 the trial tape blue strapped to the workpiece. Press the button to bring the unlock bobinThe wood. Workpiece out. Coherent piece of work Blowing with air gun Check with the naked eye. Inner label affixed Fit the bag2. be aware of packing 1 pickup with 2 channels. In each box can contain parts 5 coil. Coil of 100 m. For product box 500 m.
การแปล กรุณารอสักครู่..