The history of Ubon Ratana Dam Dam Ubolrat. A hydroelectric dam, the first built in the Northeast and is the second of the second dam. The dam was built to block Phong River area called "inflatable gripper" Tambon Khok Sung Nam Phong District Ubolrat in the past or in the present UbolratDISTRICT. Khon Kaen 50 kilometers away from the offense has operated since 2502, when the International Committee comprising Cambodia, Laos, Vietnam and Thailand, where the E. Fe (Economic Commission for Asia) was established. And the cooperation of Japanese experts. Surveyed tributaries of the Mekong River. And has offered the project Phong first. Because the benefits Sorry for the development of the Northeast. The Government of Thailand has negotiated an agreement to borrow money from banks. The restoration of the Federal Republic of Germany to the construction and off. The Electricity Act to the northeast is under construction on the 2504 construction was started in 2507 and completed in late 2508, the King had ordered. Royal permission to invite name Highness. Kanya's Royal Prince Ubolrat Dubbed the dam "Ubon Ratana dam" and the opening ceremony. His Majesty the King, accompanied by action. Her Majesty Her Majesty the Queen and Her Royal Highness Kanya's Royal Prince Ubolrat The opening ceremony for the dam Ubolrat electricity on March 14, 2509 Ubon Ratana Dam, formerly known as inflatable dam clamp. The Phong building block that UbolratDISTRICT. Khon Kaen is the first hydroelectric dam that EGAT has built up in the Northeast. And a second Thailand, the dam is a rockfill dam with a clay core length of 885 meters high, 32 meters high dam at +185 m (r vertices. - MSL) dam width 6 meters wide, the dam 120. m reservoir capacity 2263 million cubic meters Buildings Located on the left side of the dam. Installed generation capacity of 8400 kilowatts of 3 total capacity of 25,200 kilowatts later EGAT has improved dam Ubolrat. To increase the efficiency of the dam in relief. Flood gave rise And enhance safety by strengthening the old dam crest level +185 m (r vertices.) Is at +188.10 m (r vertices.) The base of the dam, which extended from 120 meters to 125 meters wide. started Since the end of 2527 and be completed in early 2530.
การแปล กรุณารอสักครู่..