In the construction phase and is now employs 25 people a day and is expected to have water of approximately 5 cubic meters per day (figure from 200 litres of water consumption rate per person per day), so the entire construction period of about 60 days, the quantity of wastewater and sewage expected to occur approximately 240 cubic meters, or 4 cubic meters per day (80 per cent of the quantity of water use; higher rank 2539 (1996) kriang flouresce or glow, loan), this project has provided portable toilets and septic tanks for operational employees in the production base with the holes in the base hole construction production area. There will be no shelter of an employee's job performance by an employee operating the project are staying at hotels or villas within the local project to hire.