3.1.1.2 environmental impact assessment
1). Construction term
The activity is expected to be dug open in front of the soil to lay water pipelines, most of which are placed in parallel with horizontal or place in the road. There may be water and dredge canals are different, or it can be built to supply irrigation water Weir elevation to be able to pump water to agricultural areas, toss more efficiently, which is expected to open in front of the excavation and construction of the various elements of the macros.A duplicate will not affect the original terrain features, but if you have to build a dam to irrigate them, there may be some areas open to catchment dam area, or if there is a forest, you may have to change the climate, from the box.As a result, water resources, there may be more water sources, however, these changes will take more space. It is a negative impact on the level of (-2)
.
2). Project action network. A water pipe system to distribute water to the various areas of the farmer, which benefits in cultivation, farmers have more water in the dry season, the action phase of the system, water network project will be huge.Grown changing geography. (0)
การแปล กรุณารอสักครู่..