To study the effects of open and close the floodgate surasawdee the water in the area against the Kam River. A case study of subdistrict administrative organization, mueang Sakon Nakhon province Kok Kong. Khandin the river Kam has taken up the construction stretches along the river Kam Kok Kong Tambon khu is the horizontal tide large width 4 meters long and approximately 2 meters high, 6825 m construction by the local organization's budget and the support budget by province and district is the central town of Sakon Nakhon. The objective is to collect information khandin Kam River construction project. Collect the damage to flooded areas, and how to repair khandin the river Kam to propose guidelines to prevent damage to the river Kam khandin construction projects that will occur in the future. The study, by the project construction drawing budget model along the river Kam khandin designed to score points according to the method of repairing the damage of construction projects to make effective design, construction, maintenance or repair restoration construction project. The benefits gained from this study will be the master data of the study area, addresses in the local and nearby areas, especially areas of project development and Central upper basin, Kam is very much to be used as information, education and sustainable development.
การแปล กรุณารอสักครู่..
