The House is a construction job that must continue, because the structure. The main tasks in this section: wall construction and installation. The band on the door, which must be done in parallel, due to the band on the wall, door and window. The House is installed, connect the wall together, ban at this stage would be just a brick to a Groove before installing a band on it. After you complete the installation. The band is already on it. So the plaster wall with a plaster wedding wedding pillars and beams. Door and window installation may continue with the installation or the installation might be gradually over time, or may wait to perform after. If the fear caused inconvenience in transport supplies or cause problems in maintaining.In the case of a House with a water hose and cord to stay is buried. The water pipe and conduit, fire on the part that needs to be buried inside the walls, you will need to do during this pipe will start after the construction of brick wall, then. The brick walls, is on the verge deep groove is scheduled to lay the pipes, embedded into the walls before plaster wall decoration. Therefore, a point that should be careful at this stage is that the walls are plaster before the wedding, make sure to place the pipes are correctly done. The position of the power switch Plug taps or devices associated with the internal pipe wall is based on, and consistent with the horizontal pipes that easily. If you are in a hurry to make a change at this stage before the plaster wall decoration.
การแปล กรุณารอสักครู่..