5.1.6 in the case of test Proficiency Testing (PT) does not pass the criteria accepted, head of Division, or the academic Manager, perform the following steps.5.1.6.1 issuing technical manager Save the test controller does not comply with the designated FM-CL-17-Division 1, with testing expertise that Z-Score does not qualify, and investigate the cause. Resolve Corrective Action Report FM-CL-19-15.1.6.2 head of Division Check to find out the cause of the error. If an error is found, follow the Guide to quality assurance testing (QP-CL-02) check for the cause. Check calculations check tools used in the test. When you know the cause of the test results is not going to follow the QP-CL-02 quality assurance test results.
การแปล กรุณารอสักครู่..
