ENGINEERING DEPARTMENT 2016
Action Plan 1: Improving Preventive Maintenance
Objective Improve Preventive Maintenance. To standards and efficiency
Problem 1. The lack of personnel and technical engineers. In operation in the field of preventive maintenance for success
2.Found that most of the machines. The condition worsen. Need to resolve the state that the availability and reliability 3
. Is working speed, and there is no standard operating procedure to clear.
4.So lack the skills and expertise in the use of computers and computer program, 5
. To coordinate with the operation, no clear patterns. And in the past, also can do as good as it should. Due to the mismatch
6.Is still unclear and paper of attitude in the work. A plan and repair protection, as well as the improvement in making better
Measures & Action 1.Obstacles to accelerate personnel lack in performance in the PM especially and set up a department, starting in the quarters 1
2.The improvement of machine, plans The period of improving state machines are available, no more than 2 month. A 1 cars (the plan attached throughout the year)
3.Preparation of standard work. According to the characteristics and types of work including
- prepare detailed working process ำงานและ methods. Specific maintenance work according to time
.- Preparation of detailed procedure and method. Task specific repair according to condition and emergency repair
- prepare detailed procedure and method. The maintenance plan and repair work to prevent
.Details of procedure and method. Each type of work. Preparation documents and manual was started in the quarter 1 - 2
4.? After the evaluation standard work, revised and updated in the quarter 3-4
5.Cooperate operation division to send the invoice repair by using e mer. Through computer. Only emergency งานซ่อม according to form specified. Start in the first quarter of 1
6.Arrange a meeting with the manager operation. Once a month (from the original plan has not successfully complete) use of the term the meeting time, about 1 hours by the day. The first of the month, when 15.00 Wednesday.Take the place of the manager and operation manager or operation the start in the first quarter of 1 (section for details. To deal with the marketing operation again)
7.The practice training system of preventive maintenance, start in the first quarter of 2
8. The practice training, technical type machine, start in the quarter. 3
9.Practice training curriculum review maintenance car, as the standard to users in the car, start at 1
10. The components of culture review maintenance car. To user (from the original plan is not perfect achievement) started in the quarter 2
11.The meeting's daily starting 16.00. - 17.00. Content summary routine and planning in วันพรุ่งนี้
.