If this is the Case and we Can not Avoid it or it Cause Too much Problem on the Productivity, we Need to consider better preventative Action (not to rely on CY clerk along). & review to Cut Range of YC railing and to Study Install Anti. corrision detector. correction circuit ESC's, the introduction of the preliminary work has already seoho normal yesterday.
การแปล กรุณารอสักครู่..
