By the volume of traffic is dense on the Highway 2 area of the Nakhon Ratchasima province (around 54000 vehicles/day, about 22% of the large proportion of cars) because it is a city with many factories and the community. For the land, Highway No. 24, which is located to the South of the railway project will be annulled, traffic is not very high, is about 4400-13500 car/day with a large proportion of the car is about 7%-18%, as shown in Figure 3.2.1-2.
การแปล กรุณารอสักครู่..
