Is the process of estimating the quantity and maximum attitude. Within the scope of established swimming areas along the railway line. Based on information gathered, hydrology-utu from 5.7.1 scope and detail areas get water from 5.7.2 topic analyzed in order to find the maximum flow rate for the design of drainage building across the way, the project with respect to the criteria and methodology in accordance with the drainage system design in construction of Highway Department road. As follows:
การแปล กรุณารอสักครู่..