5.2.4 QMR, FST, and the Dept. managers, quality assurance or those who have been entrusted to do a follow-up investigation of the practical solutions and prevent recurrences from a given date to be corrected till the finish.
5.2.4.1 in the case of performance modifications are accepted, QMR. FST and quality assurance Department Manager, or who have been assigned to sign the certificate, assuming the CAR is closed and forwarded to the QMR or those who have been entrusted to a Corrective Action Request is recorded in Log (F-QA08-2) to display the status of the CAR
5.2.4.2 in the case of performance modifications are not acceptable, and the FST QMR quality assurance Department Manager, or who have been assigned to turn off the CAR and a new version of CAR design in order to make modifications to the operating procedures 5.2.1 5.2-articles.4
5.QMR 1 or who have been assigned to make a summary of the status of the CAR and gather the information in a CAR belonging to the issues presented at the Conference in Meeting Quality review by management to jointly analyze up to using the CAR's problems. And evaluate the effectiveness of the solution and to prevent recurrence.
การแปล กรุณารอสักครู่..