Bhumibol dam-the dam Phu phon is a multi-purpose dam, the first of its kind in the country, Thai. The concrete dam is a curved image characteristics. 2496 (1953) construction was completed May 17 opened the dam is a dam formerly 2507 (1964) Yun Hi. His Majesty King ponmaphithai has been specified as thanop dam, Bhumibol dam on July 25 2500 (1957) [1]Bhumibol dam building blocks the ping River at Khao kaeo district, Tak province has three shadow radius curve 250 meters high, 154 m length 486 meters, width of 6 meters, the dam's reservoir can accommodate a maximum of water 13462 million cubic meters. Bhumibol dam is a curved dam the world's 8th largest [1]His Majesty's Royal laying tank. On June 24, in the first stage construction, 2504 (1961) contains. The construction of dams, electric power plants and transmission systems. His Majesty's Royal opening of the dam. On May 17, 1964.The Agency was established to govern the construction, maintenance and administration of King bhumipol Dam as 2500 (1957) as State enterprises named "Yun Hi electricity", which later was merged with State enterprises as "lignite" and "North-East power" as the electricity generating authority of Thailand (EGAT) Thai when people first have 2511 (1968) Governor is Mr. Kasem. From Semitic wanit
การแปล กรุณารอสักครู่..
