WH there needs to change jobs from a Rack type rack Box because of the need to reduce working time taking Part from the Rack insert in Box line > via line will not receive incoming Rack timeline.
WH is a need to change the type of container and Rack Box is because I want to reduce the time taken to work in Box Rack a Part of Your Offline> Offline The Rack will not get into line.
WH needs to change from a container type Rack Box because want to reduce the working time is taken Part from Rack put in Box of line. > the line will not be Rack into line.