Department of alternative energy development and energy conservation project, a waste of energy to wade through change of investment processing waste into energy, increasing from 26 projects ensuring a FIT purchase new power rate with optimization mechanisms to enforce compliance and renewable energy potential, with the slide zone indicator power into the system from the rubbish (COD), 134.717 from 22 megawatts of projects and approve the purchase contract signed electric power (PPA) 246.060 megawatts.Sri ranks provides a moral Director-General Department of alternative energy development and energy conservation. Revealed that the policy of promoting and improving measures for promoting electricity generation from renewable energy. In order to produce a waste group waste energy at present to push the development of garbage power plant with a power from waste up to 48 projects are produced at 380.777 megawatts electrical log for commercial purposes (Commercial Operation Date: COD) and total 134.717 from 22 megawatts of projects as well as projects that electricity trading contracts signed (PPA Power Purchase Agreement:), and is currently building another 101.656 MW. The current project is a project from the 19 that approved a potential response to buy additional power project number 7 144.404. As a result, there are more megawatts to 380.777 megawatts capacity 48 project. In the action plan under the country's solid waste management plan. (2558 (2015)-2562 (2019)) in cooperation with the Ministry of natural resources and environment, which is the primary host, and there are projects or initiatives under study of the Ministry of energy has determined the rate of Feed in Tariff electricity purchase (FiT) for electricity from garbage by the national energy policy Committee (kaphot) have agreed FiT dismissed 15 Dec. 2557 (2014) for industrial waste, garbage and FiT for the community. When the kop 16.2558 (2015) The Ministry of energy will accelerate troubleshooting and obstacles in the development of energy waste regulations.This includes coordinating requests to The electricity generating authority of Thailand (EGAT), MEA (Metropolitan electricity authority) and the provincial electricity authority (PEA). Support the purchase of electricity from waste, which the Energy Ministry is in the process of being arranged in zones (Zoning)
การแปล กรุณารอสักครู่..