Key tags "to be installed in a position where the contractor assigned to. During construction, such as in air control systems or the Security Department shall deliver the Cabinet on the eve of the final work.
Signs Key "to install in place requiring the contractor. During construction, such as the control room Air system or security department. Must be delivered to the body in the last period.
The key tag "to be installed in the position of determining contractors. During construction, such as the control room. The air system or security. Will have to deliver the safety in the send final payment