Duration: 1 year (2540-2552).Budget: 990 million. Operational guidelines. Results of operations: the construction of dam and head Assembly with other components, dams, concrete dams, irrigation is the stronghold of Khun Dan compacted (RCC DAM), the largest in the country, Thailand. With a height of 93 m long 2,594 m 112 m at the dam level + sea level surface area catchment basin 3,087 acres can be the current 224 million cubic meters has taken and completed all of the catchment and begins from October 2547 (2004)