Technical problems in architectural and engineering of buildings and the runway than 60 items such as water under the Taxi way, electrical lighting in buildings, enough, Late 400 Hz to send a fire so that the plane is too short.Air conditioning system building work is efficient, the material is not standard, such as the mirror temper laminated door rotate, number of bathrooms to the living area,. The negative image in the eyes of most people,, Mingling of construction workers building,The airport, no construction and AS, BUILT DRAWING accident with people across the road in the airport, IT system within the building is still in use, not 100% label system is not unity,. Trolley is not enough,The purpose of this escape route in case of emergency, the unavailability of personnel. In case of emergency, airport regardless of the guests
.