And if there are few unfortunate rain for several consecutive years, as an example of runoff model ships e Su in the Mae Klong River basin, Kanchanaburi province, these natural events. Cannot control or change it. The occurrence of flooding in the rainy season and the lack of water in the dry season, it has a chance to occur at any time if there are no tools in the appropriate water management. The reservoir, which currently has an appropriate size is one of the tools that are effective in water management. By catchment during the flood relief and water backed up in the water shortages range.Such a reason. Construction of the reservoir, it is necessary to alleviate the country's water issues and remedy the problem. Not for hydro power production. But the installation of the dam's hydro power is a more efficient use of water, increase the value of water. Reduce pollution and global warming and make the construction of a reservoir can be a faster payback. Therefore, The idea to install a hydro power plant, building irrigation projects, elements that exist in the present, electricity generating authority of Thailand Thai progress by receiving cooperation from the Royal irrigation Department, is the correct approach and should accelerate the expansion operation.
การแปล กรุณารอสักครู่..