-Prepare and distribute document production, production-The requested Material By Transfer from the Design Department retrieves the BOM, and then send it, Stroe, to make.Distribution in Lai น้ทำการ production.-Print Design Card by pulling the data from the Tag to sort and check the number of the work piece, then Print, then compassion, production timeline.Ginkgo piece and complete tasks.
การแปล กรุณารอสักครู่..
