The level set when the kits are not level, put into the steel lining between the beam and the ground plane to adjust level. Of the series, to put the steel lining thickness 1 pieces, and also some bottom and top. When set, and should connect the base to have the thickness 2 mm.
การแปล กรุณารอสักครู่..
