Regarded as the most important of the project because the project's main revenue from electricity generation in order to sell the contract to be traded
(1) Production control system, based on the international standard ISO 9000: 2000 quality control system
.(2) reducing production costs by buying fuel at lower prices in other reservations and then stored as the fuel stock. Fuel, which contains low-cost came into the production process.
(3) production unit split is a time shift (shift) 4 times, 3 per day-shift time shift control and one time shift for preventive maintenance
.