AAT must lose time waiting for the way TSRA. Change to 1Hr.TSRA waste time bringing a workpiece to change 1 Hr. wasted time. 3. Hr and sorting stock split at the AAT to support for 2 people/day.
AAT need to wait for the TSRA. Replacement parts for 1Hr.TSRA need to bring work to change 1Hr. Waste time sorting stock 3Hr. Having to share personnel and to support port AAT 2 / day.
AAT waste time waiting for TSRA change parts 1Hr.TSRA waste time the workpiece to change 1Hr. Time sorting stock 3Hr. And the personnel support. AAT number 2 people per day.