The construction of the pull steel suitable for mass production at the same time in the system to produce this database structure is the same distance than on-line butter apartment 100 meters.. this production system used for construction of pile bridge beams or floor of C.Prestressing steel pull later
.This is a compression force in another way in which used widely as well. Suitable for structure which is large, which is convenient in transportation. Or for the construction site, which are far more conduit pipe factory.Aang neck storage on either side, then the pouring concrete When the concrete hardens and curing are high enough to receive the compressed strength using a hydraulic jack. Pull out the steel based on lean with concrete beams.We can make the steel wire attached to the concrete body along the entire length of the beam by compression mortar end side jack into the pipe conduit fully. Tendon is packed more resistance is called bonded tendon tendon parts that do not have compressed mortar in conduit.Unbonded Tendon beam which is bonded tendon behavior should be in the overload better beam which is Unbonded Tendon normally tendon one consists of high strength wire. Strand several hundred in the same line conduit pipe and equipment anchorage.Strand in conduit
.F.
การแปล กรุณารอสักครู่..
