Due to the flooding occurred in the PA SAK River basin in flood season and water shortages in the summer, which occur annually. On February 19,Prof. 2532 (1989), which resolves the problem in the lower part of the Chao Phraya River basin and in Bangkok and suburbs as well, until May 3, 1937. 2537 (1994) Cabinet has approved the construction of the project, the dam catchment PA SAK River later to study the suitability and impact on the environment.
การแปล กรุณารอสักครู่..