To make the tables produced by the scheduling program. It is necessary to provide detailed information of the work, such as work flow (Process), the time machine (Operating Time) of the machine preparation time (Setup Time) set points to send the parts (Set Address) and machinery used in the production of each job. For the scheduling of program scheduling. The above information must be supplied to make the schedule. Apply the result to the appropriate method, and it works as a tool for decision-making in order to work.
การแปล กรุณารอสักครู่..
