So who do we have the idea of downgrading Bowl downs as every four hours of work by the Bowl-down rate was calculated by the water monitoring not to exceed the standards set.
Therefore, the organizer has a concept to reduce the blow down to every 4 work hours. according to blow down rate were calculated. the inspection of water not to exceed the EPA standard.