- Wastewater Management Project. Details are as follows (Figure 1)
wastewater treatment system at about 722.2 cubic meters / day, including
1) the waste water from the production of approximately 230.7 cubic meters / day. (Composed of waste water from the production line at one of about 126.2 cubic meters / day. And the waste water from the production line two about 104.5 cubic meters / day,
2) water to prevent clogging and take the sludge about 72 cubic meters / day (includes wastewater from production line at one of about 36 cubic meters. / day And wastewater from the production line at approximately 36 m 2 / day.
การแปล กรุณารอสักครู่..
