The results from an analysis of the value of the index of cement is a study to determine the effect of energy-saving factories based on the energy section of the Department of alternative energy development and energy conservation (phop.), which are issued at.Control of plant types obey the industries will be split, as the type of measures on energy and industrial plants, and in this Paper the study on cement plant, which will use different types of power: power, heat power factory Urumqi tasa.Six transactions in number 9 cement plant in cement factory plant will have 9 power-saving measures through Department of alternative energy development and energy conservation (phop.): thermal energy. Measures that try to take advantage of the rest of the material, including the use of industry and agriculture, improve the performance of the pot burnt cement, measures to improve the efficiency of production processes in industry, other ways to improve the efficiency of fuel burning in the stove, UMA tasa.Six transactions and energy measures that try to get: the use of air conditioning in the new series, the original series is high performance replacement, changing from a fluorescent tube T8 size 36 Watt type. T5 type, the use of high-performance machinery and equipment, reducing the leakage of compressed air as a power-saving effect which will be located in%, which results in a study of energy consumption in industrial plants, cement designed for both power savings can be summarized as follows: the category of electric saving energy = saving 18.12% of total power consumption, saving power and heat-type = 38.00% power savings can be summarized = 37.34%
การแปล กรุณารอสักครู่..