From the initial inspection, it was found that the path construction railroad square - Photography - nong BUA lamphu runs through Chi River Basin and the Mekong region. As shown in figure 5.7.1-1 which climate is shown in table 5.7.1-1 to table 5.7.1-3 and show the monitoring stations, runoff and rainfall monitoring stations located around the project area as figure 5.7.1-2 respectively.
การแปล กรุณารอสักครู่..