Have to move all of the waste is not available. the soil is moved, the loan wells West, and wait for the landfill by the newest brands within the pit will not affect health and the environment in the future.
Had to move all the garbage that can not be used. It was moved to the western ponds lend. And wait for the landfill by backhoe inside the hole. There will be no effects on health and the environment in the future.
Has moved all the junk is not available. Have been transferred to the pond to borrow in the West. And landfill by dilatation within the holes. There will be no impact on health and environment in the future.