The construction is divided into zone 1 centers, building construction trades under the name AEC CENTER MALL, ground floor, floor 1-2 is a shopping centre, floor 3, Office Office building is a 5-floor 6-13 development of a.
The construction is divided into the first building under the AEC CENTER MALL Shopping Center floor, the floor, a shopping center, 1-2, 3-5 Class A office building and hotel development is a top 6-13.
The construction is divided into zones 1 building shopping center under the name AEC CENTER MALL on the ground floor, the floor 1-2 is a shopping center, floor 3-5 created an office. And I 6-13 developed into a hotel.