Huay Mae Canyon reservoir project on due to the initiative.Amphoe Mae Tha, Lampang province The initiative: His Majesty the King The history of the project: July 8-2548, Mr sharp ridges and mental confidence at Lampang provincial Council members. Amphoe Mae Tha request courtesy of budget construction of reservoirs on the River Canyon via the Advisor to the Prime Minister. Mr. Phinit Monday, Surin to solve problems, drought and flood relief in the zone. February 18-2552 Mayor sub-district contest Shoals subdistrict, edit Amphoe Mae Tha, has asked the Royal reservoir construction project on the Huai Mae Canyon and graciously accepted a Royal development projects, according to the book, when the May 6 2254 scroll 0008.4/7251. -Irrigation Department offices, construction, water resources development, Office 2, medium. Classified as a construction plan in the budget year 2556.The location of the project: Moo 1, ban Don kaeo path. Shoals t. glass. Amphur Mae Tha, Lampang, NakhonThe purpose of the project: To supply water for farming, both in rainy and dry season of House of representatives shoals glass. Moo 1, total number of 175 people, 611 households, population and household number 237 Moo 3, Shirakawa-mother households, population 761 people, 412 households, the total population of 1,372 people. Agency/agencies: -The Prime Minister's Office -Office of the Committee for the project due to the initiative. (Office, kapon). -Department of irrigation. Beneficiary: House of representatives shoals glass Moo 1, total number of 175 people, 611 households, population and household number 237 Moo 3, Shirakawa-mother households, population 761 people, 412 households, the total population of 1,372 people. The results of operations and project activities: 1. soil embankments construction, width length height 8.00 m m 15.00 247.00 capacity retention levels. M3 254,500 2. construction of sewer overflow trough (the Ridge drain overflow width) 1. 100 m. wide pouring trough M. height 1.20 m long, 160.00 3. building pipes 0.50 m 100.00 m long, on the left hand side. 4. to release the water, down the river system to the original irrigation system water resistance. A total of eight rods 1,679 acres irrigation area covers an area of increased 1,179 Rai. 4.1 Weir plus vegetables (a concrete Weir) 47 QNV 517-887-coordinates the displacement along the water mine 4844 | right. Benefits of about 229 acres area, construction of the House of representatives by year 2548 glass present shoals. 4.2 early Dept. kt (concrete Weir) coordinates 47 QNV 518-881 with water displacement, 4844 | mine right. An area of approximately 150 Rai benefit construction of the House of representatives by year 2547 glass present shoals with sediment piles Weir page. Spring planting must help each dredge took sludge every year. 4.3 the wild goats Dept. tension (a concrete Weir) coordinates 47 QNV 516-883 the displacement along the coast the water mine 4844 | wai areas, approximately 200 acres and advantages, built by the people, the year 2548 glass present shoals homes damaged, use its full potential. There is soot falling piles full fai. The two servants Dept. snake ear kanam eroded when spring planting, the people, want everyone to help repair and dredge took sludge every year. 4.4. the early Khoi Weir (dam of concrete) coordinates 47 QNV 516-887 displacement water mines with 4844 | left approximately 150 Rai benefit space construction by Raman donban shoals and the mother house of representatives Waleed. The current conditions are the sediment a year 2547 piles full fai. 4.5 Weir Nong Bon (concrete Weir) 47 QNV 517-887-coordinates the displacement along the coast the water mine 4844 wai |. The floor is approximately 250 acres to receive benefits calibrated, built by the people, the House of representatives and the House mother shoals Waleed. Current weather-year 2556. Nong phai dam 4.6 (concrete Weir) coordinates 47 QNV 516-889, displacement, mine water with 4844 | left approximately 250 acres benefit areas built by the people, the House of representatives and the House mother shoals Waleed. Year 2541 current conditions damaged dropped Jung doesn't work its full potential. Are there piles full sediment dam? 4.7 the clarifier swag (a concrete Weir), construction area of about 250 acres benefit 2555. 4.8 fai, Wang Tung-soil (concrete Weir) coordinates 47 QNV 514-948 4844 tonnage with the water left the mine | area of approximately 200 acres benefit construction by saban sub-district contest year current weather using 2550.It well. Operator (in the operation): Construction of two Office Development Office, a medium-sized water resources irrigation Department.The success of the project: the project's results (OUTCOME). -Positive -Can the water helping farmland in the rainy season the people, 1,679 acres, 2 200 Rai village number 412 households. Corporate account users to use irrigation water management irrigation water. No. 5205200202-2552 (2009)-8-0008 1,679 acres, covering an area of 164 members list. -How can I fix the drought and flooding in the area, the Creek is a river, a branch of the Canyon mother Creek mom Waleed. River basin area, Wang -Help consumer and as a source of water for fish breeding. -Negative -Area of forest South fade left mothers affected by the construction. 47-1-48.8 Rai permitted exploitation in national forest areas, according to the Thai Department of forestry vol. 27/2555 (2012) down September 26 2555 (2012) -Soil and embankments leading space located in area flooded floor water quality class 2 and class 4. -App.
การแปล กรุณารอสักครู่..