(2) In the green area for the first m / people must think of the number of residents and number of employees
(3), must provide for the trees to the landscape Buffer Zone surrounding the project by the Buffer Zone. have a width not less than one meter If a width of less than one meter can not be charged as a green area of the project
(4) of green space along the building project must be located outside cover. By asking the display frame building land cover to clear
(5) Chart planting perennials Tier 1 required the utilities are underground, so clearly, including wastewater treatment, water storage pond, localized water (shown as a dashed line). sewer lines and manholes. Irrigation pipeline Cross-section showing the position of the perennials are planted close to the utility system. So that the perennials. Not overlap with the utilities
(6) to plant trees around the pool. Must choose a species that does not fall easily. Keep it clean