A thesis, this edition aims to eliminate the problem from occurring in the neck of the bottle, 2 work stations in the process of cutting edge/rolled edge is a problem cause the wait is absolutely refrain from bringing Jig mold cutting edge/edge come rolling into repair process, which takes about 5 hours to repair a 1 series, and a major problem is settled in a hurry of the jig mold cutting edge/edge rolled, resulting in a time similar to the original molds Jig repairs are not finished, there's a new way to cause a cumulative works making machines from 11 machines. Using only 8. Average/month until the cause of the production is not sufficient to determine the needs of the company need to open overtime. An operation to eliminate the problem of loss of capacity from a machine that is used in the repair of full performance from the trim template edge rolled sandwiches by the leading quality tools (7QC Tools), Tree Diagrams, and scoring 5W1H weighted FMEA came into the tools used to solve problems that occur in the work station 2. In the process of cutting edge rolled edge, can can produce enough of a work plan to reduce to open overtime. The result of the operations found that, from the repair takes 5 hours to just 25-30 minutes and can also repair it without having to move the trim template Khon rolled edge repair Department reduces the movement and decrease the welding works of employees. The machine can work 11 to open the machine working overtime increases.
การแปล กรุณารอสักครู่..