Solutions by horizontal initiative1. accelerate the construction of floodgate Pak phanang, completed as soon as possible because it is the starting point and the main task is to resolve the problem of shortage of fresh water for agriculture and consumer.2. to solve the problem of flooding in the area, eating areas, saton. 2.1 emergency drainage canal dug with construction control of foot-and-mouth to drain the Canal from the river Pak phanang sea flooding event.2.2 dig expands the Khlong tha building with serpent sea floodgate to drain out another way.2.3 dredge canals, Klang Khlong Pak phanang The Canal in front of the knot, with construction of floodgate singing Tiger (Tiger House construction hueng) and knot front gate to drain into the sea faster.Cha-UAT drainage canal 2.4-phraek city construction of floodgate to aid drainage away from the project area, down to the sea in case of flooding.3. define a clear field and appropriate to separate the fresh water and salt water areas from each other, certainly. The East of the Canal (Khlong Sai heads) Pak phanang is a salt water area, assuring the Fisheries Department water enforcement of building construction. This salt water irrigation system, irrigation Department. Department of fisheries, as well as those involved jointly consider the corridor for optimization.4. an area west of the Pak phanang River is a mountain project planning and construction Committee, reservoir or dam to irrigate farmland to help business and consumption goods to help relieve flooding in the region.
การแปล กรุณารอสักครู่..