That is the position and size of openings. Yes or no The top floor will be opened by deep, 15 cm and depth, size 12-16 cm (depending on the type of equipment) through the floor, which is prepared for a wait for the installation of drain and sewer afterwards. Yes or noThe device will be worn whilst covering drainage pipes. Yes or noTypes of sewer drain of a stainless steel stainless pipe drainage domains which the materials from a job or some other system such as PVC.
การแปล กรุณารอสักครู่..