The budget for the establishment of 73340000 baht, divided into subsidies from environmental funds 51338000 Thai baht THB 22002000 municipal contribution consists of. Construction waste leaching water collection pond. Work the pond pump control building and waste leaching Road construction works and water-blocking garbage washed cars, jobs, teaching aids.
การแปล กรุณารอสักครู่..