Background.Basin Project Kam, Nakhon Phanom is a project that the local people along two side stream Kam in Bangkok and Nakhon Phanom, Sakon Nakhon, presented for help. From his Majesty the king had solved the problem areas, the two side of the river Cam. Since Nong Han District, Amphoe Mueang Sakon Nakhon Phanom District, until the district Nakhon Phanom the flood overflowed in the rainy season, that is, when the water in the river, there is a high level to make the river cam which is connected to the Nong Han can not flow. Into the Mekong River, causing flooding problems, the two sides River Kam is a wide area, and for a long time, cause damage. The area of people is a lot, especially in the lowland tribute in the dry season in the Mekong River water level low, stream water Kam flows into the Mekong River. Until almost the people"s suffering. Due to the lack of water for agricultural, consumer goods, and theThe 23 November 2535 H.M. the king hath a royal to the Department. Consider construction project in Kam. Nakhon Phanom to help drain the flooded area on both sides of the river Cam during the rainy season. And the water in the river cam to people using consumer and farming. Also provided in the Nong Han water level control in the appropriate level. Along with the construction, building water force periodically. As well as to dig the factorial design both 2 lines. By digging connect from Nong Han along the two side of river area that Phanom District Kam to Nakhon Phanom, with building construction force to tear canal act. Help drainage from the area to flood in the rainy season. Another Tang to the natural swamp. In order to be able to hold water more and more.Sacks and objective.1) to farmers in the community have guidelines for the restoration of the Royal natural resources and environment.2) to soil and water conservation3) to improve the maintenance of soil and land use for agriculture sustainable
การแปล กรุณารอสักครู่..
