The planned production Line:. Com is at 127.4 thousand vehicles. Production dropped 0.01 for every 10,000 vehicles The plan supports the Assembly is assigned a non-work day in month 2 and 3.G Line: planned production stood at 14.8 thousand vehicles. Reduce the production of 10,000 cars, 0.01 Assembly continues to use the original work in working days.