The timing of this style. We could prepare for a certain time, because.We have presented a plan and canopy. When the date 5-11-2014 and shop drawing. Start date: 14-11-2014But that has not yet been approved by the project consultants, because the owner of the project to increase the length of the roof, from 1.00 to 1.50 m.Up until yesterday, 28-11-204 The owner of the project summary, use the same size 1.00 m.
การแปล กรุณารอสักครู่..