Before ever telling on the part of supply production also have regular work or not. In the sections that need only supply less ideal, even if there is a problem, it must be noted. Most of the time, it is a problem we have to check all the systems must supply to the production Division. If we do not have to check the production problems.
การแปล กรุณารอสักครู่..
