- Building construction (Pre-primary)
- Construction of earthen embankments defile the second
- the construction of embankments, soil and buildings
- Construction of the earthen embankments that one
- construction of pipelines, water
- runoff flows into the basin. The average 41.83 million cu. M. / Year
- the average annual rainfall of about 2130 mm.
- Length of the river upstream from the dam to the soil around 11.50 km
- of waterlogging in the past year, about 100 140 cubic meters / second
-. waterlogging of the highest in 500 years, about 180 m / s
- maximum water level (in French.) + 66.22 m. (the vertices.)
- water retention (the bird.) + 64.50 m. (the vertices. .)
- low water levels (in French.) + 47.00 m. (the vertices.)
- water retention level of 30.00 million cubic meters
- the minimum amount of water to 0.550 million cubic meters
- the surface area. 3056 acres at the highest level
- at the level of the water catchment area of 2,750 hectares
- an area of 138 hectares, the minimum water level.