Make a study to reduce the amount of dust caused by construction of the road. By injection of water in the area around the construction area. I found that the quantity of water used in the experiment of 0.5 liters per square meter as the distance of 500 metres of road can reduce the amount of dust has reached 62.84 poesen.
การแปล กรุณารอสักครู่..