Aluminium window, door installation-to install all the channels open to properly prepared and are responsible for monitoring and coordinating the pole n and leveling beam lintel by Jack circle on the surface to give the frog of the pole n and beam lintel and leave around 5 mm per side is down, and every corner of the scene.
การแปล กรุณารอสักครู่..
