The update the embankment
1. Increase the height of the dam. Ajarn meters 185 meters from their original level (รทก.) A level 188.10 M (รทก.) width the embankment dam base expanded from the same original wide perspective
120 meters 125 meters 2.Improving the thermal expansion water overflow wall foundation post, land and reduce the threshold level thermal water overflow down 5 meters from 176 meters (รทก.), as well as change the water cooling kit, and 4 is a lower level of water and improve water rail end of water (Stilling Basin) to reduce the impact of the water cooling water out to the end of
3.Other accessories such as wall units work claim land, building up power plant Ajarn M winch Update access to the rooms, etc. etc.