Sorry, that email response is slow because I have to wait for the sale of tanks, FRP tank inspection dates assigned to FRP.1. FRP tanks via the seller States that the audit can be accessed day 29-6-2559 (2016)2. the electrical system will open PO then.
การแปล กรุณารอสักครู่..